A squared, Compliant Slab Edge On Every Pour.

Folding a membrane up the slab edge by hand is the slowest part of edge detailing, and the hardest to keep consistent. The Edge Vapour Barrier™ (EVB) is a pre-engineered, 100% Australian-made solution that installs during standard formwork preparation and delivers a clean, squared edge every time.

Speak to the Team

The slab edge is where your slab and your margin get exposed.

Under AS 2870 and the National Construction Code (NCC), the vapour barrier must return up the slab face and terminate at finished ground level, while remaining undamaged throughout the build. 

Traditional hand-folded membrane installations rely on workmanship, site conditions, and individual interpretation. As a result, slab edge details can vary from project to project, increasing the risk of inconsistent outcomes during inspections or after handovers.

It’s not about trades doing the wrong thing – it’s about giving them a solution that’s designed to achieve the same compliant outcome every time.

It's not about changing how you work. It's about having a product that's purpose-built for that exact detail.

The Edge Is The Detail Everyone Checks.

Around 15–20% of NSW defect notices for Class 1 and 2 buildings relate to slab edge dampness or membrane issues (NSW Fair Trading Defect Library, 2025). A consistent, compliant edge detail is becoming one of the clearest marks of quality concreting work.

Time On Site

Folding, taping, and reworking membrane edges adds handling time to every job. EVB replaces that step during standard formwork setup.

Consistency

Hand folds vary between crews, weather, and site conditions. A pre-engineered profile delivers the same squared edge across every slab.

Repeated Work

Builders remember slabs that pass inspection for the first time. Consistent edge details help keep your crew on the preferred trades list.

A smarter way to finish the slab edge.

The Edge Vapour Barrier™ (EVB) replaces traditional hand-folded membrane detailing with a purpose-built slab edge vapour barrier that installs during standard formwork preparation.

    Why Builders Choose EVB

    • Installs during formwork setup, with no change to how you pour
    • Delivers a clean, squared edge on every slab
    • Replaces the slowest step of membrane installation
    • Clear installation instructions for every crew
    • Installed by the same person responsible for the ground membrane installation.
    • Helps eliminate air pockets and excess concrete to escape from beneath the formwork, resulting in improved compaction at the slab edge.

    Precision Engineering

    EVB's pre-engineered profile takes the critical edge detail out of hands-on folding, delivering the same repeatable result on every slab.

    Designed for Australian Standards

    Designed for Australian Standards. EVB is manufactured to meet and exceed AS 2870 and NCC requirements.

      Backed by Industry Data

      NSW Fair Trading Defect Library (2025): ~15–20% of defect notices for Class 1 & 2 buildings relate to slab edge dampness or membrane issues.

        Easy To Install

        Fits into standard formwork preparation, with clear instructions for every crew.

        Faster Setup

        Replaces the slowest, most awkward part of membrane installation at the edge.

        Consistent Every Pour

        Pre-engineered profile means the same result, regardless of who's on the tools.

        Squared Edge

        A clean, squared slab edge across every pour, whatever the site conditions.

        Keep Builders Happy

        Edges that pass inspection first time help keep you on the preferred trades list.

        Australian Made

        100% Australia made, invented and owned. Designed by a builder.

        A small detail with a big cost difference

        An engineered edge at pour stage costs the job around $1,000. A failed edge costs tens of thousands to rectify, and someone has to wear it.

        EVB at pour stage

        ~$1,000

        Installed with your formwork. Done once, no comeback.

        Failed edge remediation

        TENS OF THOUSANDS OF DOLLARS

        Excavation, injection, or re-membraning after handover, plus the supervision time to manage it.

        Frequently Asked Questions

        How Does EVB Install?

        During standard formwork preparation. It replaces the membrane-folding step rather than adding one, and comes with clear installation instructions for every crew.

        Will it change how I set up formwork?

        No. EVB is designed to fit standard slab-on-ground formwork preparation and work with the way you already pour.

        Does EVB comply with AS 2870 and the NCC?

        Yes. EVB is manufactured to meet and exceed AS 2870 and NCC requirements, providing the compliant termination up the slab face to finished ground level.

        Where can I get it?

        Contact Us, or book a product walkthrough and we'll take you through it before your next pour.

        What about Drop Edge Beams (DEB)?

        Two-course Drop Edge Beams are available as standard. For anything greater than two courses, our installation video provides step by step instructions on how the two-course Drop Edge Beam may be adapted to suit project requirements.

        What type of slabs can the Edge Vapour Barrier (EVB) be Installed on?

        EVB can be installed on most slab-on-ground concrete slabs, including waffle pod slabs 

        Australian Made

        100% Australian made, invented & owned

        Built for Durability

        • Purpose built for installation accuracy

        • Pre engineered design reduces installation error

        Australian Standards

        Manufactured to meet and exceed AS 2870 and NCC Requirements

        Make every edge a squared, compliant edge.

        Speak to the team about EVB, or request product information for your reference.

        Speak To The Team