INSTALLATION GUIDE
This installation guide will take you through the correct preparation and step by step process required to achieve a compliant and high quality Edge Vapour Barrier installation.
WATCH INSTALLATION VIDEO
TOOLS REQUIRED
- Hand saw or reciprocating saw
- Laser Level
- Timber concrete float
- Rubber mallet
COMPONENTS
- Six metre angles
- External corner
- Internal corner
- Joiner
- Left-hand side drop edge beam mould
- Right-hand side drop edge beam mould
Step 1 - Review Drawings
1a. Review engineers and architectural drawings to understand site layout and starting point
Step 2 - Surface Preparation
2a. Prepare the slab perimeter surface—clean, dry, level and ready
Step 3 - Site Preparation
3a. Laser-level the tops of all perimeter piers. Precision is key here.
3b. Smooth out the surface using a timber float for a clean, level finish.
Note that having the external pier height uneven even if only by 5mm will compromise the installation of EVB and finished product. It’s important to note that getting things right from the very beginning will give you the desired results.
3c. Adjust the pier heights to accommodate what is commonly referred to as a 'dropped edge beam,' with a precise reduction of 172 mm. While this is the standard increment recommended for slab steps, larger variations may be feasible and will be discussed in greater detail in the installation video.
3d. When spacing out your drop edge beams, maintain a minimum clearance of 1 metre from all internal and external corners, to allow for proper installation of corner moulds.
Step 4 - Edge Board & Slab Coordination
4a. Install the edge boards 155 mm above pier level. Although the EVB measures 150 mm in height, the additional 5 mm provides a tolerance to accommodate minor construction.
4b. For structural slabs like alfresco areas, ensure EVB angle aligns with the rebate height.
4c. Now, ground prep before any EVB is installed.
4d. The perimeter must be flat, flush with pier tops, and debris-free. It is common to level any low areas between piers with metal dust
Step 5 – Edge Vapour Barrier Installation
5a. Start EVB layout with corner pieces, 172mm drop edge beam steps, joiners, then edge angle with 200 mm overlap. Cut edge angle to length where required"
5b. If EVB sits above formwork timber, check for undersized timber, uneven piers/surface, or debris." Do not proceed further until appropriate remediation is undertaken so that EVB may finish at the correct height.
5c. Fit top retainer clips over timber and EVB.
5d. Lay the polyethylene membrane
5e. Extend the membrane to the base of the EVB angle, ensuring a minimum overlap of 200mm, before trimming to the required length. Alternatively, the ground membrane may be installed prior to the EVB, however, this approach necessitates that perimeter preparation, outlined earlier, be completed before formwork installation. While both methods yield the same intended outcome, levelling the perimeter without the formwork in place may present additional Challenges.
5f. Press EVB firmly, your engineer may request taping it to the membrane—no stretching!
5g. Install additional top retainer clips as necessary, accompanied by steel concreter brackets. It is essential that the brackets are positioned precisely within their designated slots. Ensure the EVB is securely fastened to the formwork to achieve optimal results after concrete placement.
5h. If the EVB becomes warped, remove the bracket, thoroughly clean any residual concrete, and reinstall it flush with the surface. It is essential to ensure that brackets are installed only in their designated slots to avoid exerting pressure on the perforated anchor, which can lead to EVB deformation.
Step 6 – Concrete pouring and finishing
6a. Before pouring, confirm all EVB sections are supported
6b. In winter, pour perimeter slowly with a vibrating tool before moving inward.
6c. Avoid spilling concrete between EVB and edge board
6d. Finish the rebate with a timber float after removing clips
6e. Remove lower edge boards only after curing. Lift vertically—never strike with a hammer.
IMPORTANT
This product is manufactured to meet the material performance requirements for vapour barrier / damp proofing membranes used in association with concrete slab-on-ground construction designed in accordance with AS 2870 – 2011.
Compliance with AS 2870 is dependent on correct installation in accordance with the Standard and the above installation guidance. Any guidance provided by Slab Solutions Pty Ltd is general in nature. The installer is responsible for ensuring compliance with all applicable standards and specific project requirements.

Get in touch now for your complete and compliant solution for concrete slab edge protection.
Australian Made
100% Australian made, invented & owned
Built for Durability
• Purpose built for installation accuracy
• Pre engineered design reduces installation error

Australian Standards
Manufactured to meet and exceed AS 2870 and NCC Requirements